Autonomous AI Project Management System: Development and Deployment

We design and deploy artificial intelligence systems: from prototype to production-ready solutions. Our team combines expertise in machine learning, data engineering and MLOps to make AI work not in the lab, but in real business.
Showing 1 of 1All 1564 services
Autonomous AI Project Management System: Development and Deployment
Complex
from 2 weeks to 3 months
Frequently Asked Questions

AI Development Areas

AI Solution Development Stages

Latest works

  • image_website-b2b-advance_0.webp
    B2B ADVANCE company website development
    1357
  • image_web-applications_feedme_466_0.webp
    Development of a web application for FEEDME
    1248
  • image_websites_belfingroup_462_0.webp
    Website development for BELFINGROUP
    954
  • image_ecommerce_furnoro_435_0.webp
    Development of an online store for the company FURNORO
    1187
  • image_logo-advance_0.webp
    B2B Advance company logo design
    644
  • image_crm_enviok_479_0.webp
    Development of a web application for Enviok
    925

A team lead spends 30% of their time manually collecting statuses. Sprint goals are missed due to unnoticed blockers, and the PM is buried in reports. We develop an autonomous AI project management system that takes over the routine: autonomous task decomposition, real-time progress tracking via multi-agent orchestration, predictive deadline risk detection, and automated report generation for different audiences. As a result, the PM gets time for strategy, and the team gains transparency and focus.

In one deployment for a SaaS company, we reduced PM time on administrative tasks by 42% and blockers older than 3 days by 71%. The system based on LangGraph and GPT-4o processes projects 3 times faster than a human. Budget savings reach $40,000–$100,000 per year depending on scale.

Core capabilities:

  • Autonomous backlog grooming with LLM-based epic decomposition
  • Sprint burndown trajectory analysis and velocity gap detection
  • Dependency graph traversal for blocker escalation
  • Sentiment analysis of standup updates

Problems We Solve

Invisible progress

Task statuses are collected manually; information is outdated by reporting time. Our AI agent pulls metrics from Jira every hour, records velocity deviations, and sends alerts.

Delayed blocker detection

A blocker can linger for days before the PM notices. The system escalates tasks blocked for more than 2 days, specifying dependencies and developer load.

Manual epic decomposition

Breaking down a large task takes the PM 2–3 hours per week. An LLM agent splits an epic into atomic tasks with acceptance criteria, story points, and required competencies.

How AI Detects Deadline Risks

The system analyzes the sprint in real time. If velocity falls behind plan by more than 5 SP, the agent generates an alert with a recommendation for scope review. Blockers older than 2 days are escalated with dependency details. The LLM analyzes patterns: risk concentration on one developer, technical debt on the critical path.

class RiskDetector:
    RISK_THRESHOLDS = {
        "velocity_gap_critical": -5,
        "blocker_age_days": 2,
        "overloaded_developer": 1.4,
    }

    async def analyze_sprint_risks(self, sprint_data: dict) -> list[dict]:
        risks = []
        velocity_gap = sprint_data.get("velocity_gap", 0)
        if velocity_gap < self.RISK_THRESHOLDS["velocity_gap_critical"]:
            risks.append({
                "type": "velocity_lag",
                "severity": "high",
                "message": f"Lagging {abs(velocity_gap)} SP behind planned progress",
                "recommended_action": "Review sprint scope — possibly move tasks",
            })
        for blocker in sprint_data.get("at_risk_tasks", []):
            blocked_days = blocker.get("blocked_days", 0)
            if blocked_days >= self.RISK_THRESHOLDS["blocker_age_days"]:
                risks.append({
                    "type": "prolonged_blocker",
                    "severity": "critical" if blocked_days > 3 else "high",
                    "task": blocker["task_id"],
                    "message": f"Task {blocker['task_id']} blocked for {blocked_days} days",
                    "recommended_action": "Requires immediate PM intervention",
                })
        if risks:
            risk_assessment = await self.llm_risk_assessment(sprint_data, risks)
            risks.extend(risk_assessment)
        return risks

    async def llm_risk_assessment(self, sprint_data: dict, known_risks: list) -> list[dict]:
        response = llm.invoke(f"""Analyze sprint data for hidden risks.
Data: {json.dumps(sprint_data, ensure_ascii=False)}
Known: {json.dumps(known_risks, ensure_ascii=False)}
Return JSON with type, severity, message, recommended_action""")
        try:
            return json.loads(response.content)
        except Exception:
            return []

Core of the System: AI-PM Agent

The agent is built on LangGraph and GPT-4o. It takes the project state and executes a chain of tools: fetching metrics, analyzing blockers, creating tasks, sending notifications.

from langgraph.graph import StateGraph, END
from langgraph.prebuilt import ToolNode
from langchain_openai import ChatOpenAI
from typing import TypedDict, Annotated, Optional
import operator

class ProjectState(TypedDict):
    project_id: str
    sprint_data: dict
    team_capacity: dict
    blockers: list[dict]
    risk_flags: list[dict]
    action_items: Annotated[list, operator.add]
    generated_reports: Annotated[list, operator.add]
    notifications_sent: Annotated[list, operator.add]

llm = ChatOpenAI(model="gpt-4o", temperature=0.1)

PM_SYSTEM_PROMPT = """You are an AI project manager. Analyze the sprint and make decisions like a Scrum Master:
- Identify risks based on velocity trend and progress
- Propose concrete actions
- Consider task dependencies
- Escalate blockers"""

PM Agent Tools

from langchain_core.tools import tool
import json

@tool
def get_sprint_metrics(project_id: str, sprint_id: str) -> str:
    """Get sprint metrics"""
    sprint = jira_client.get_sprint(project_id, sprint_id)
    done_sp = sum(t["story_points"] for t in sprint["tasks"] if t["status"] == "Done")
    in_progress_sp = sum(t["story_points"] for t in sprint["tasks"] if t["status"] == "In Progress")
    total_sp = sum(t["story_points"] for t in sprint["tasks"])
    days_remaining = sprint["remaining_days"]
    days_total = sprint["total_days"]
    velocity_expected = total_sp * (1 - days_remaining / days_total)
    velocity_gap = done_sp - velocity_expected
    return json.dumps({
        "done_sp": done_sp,
        "in_progress_sp": in_progress_sp,
        "total_sp": total_sp,
        "velocity_gap": round(velocity_gap, 1),
        "at_risk_tasks": [t for t in sprint["tasks"] if t.get("blocked") or t.get("overdue")],
        "days_remaining": days_remaining,
    })

@tool
def analyze_blockers(project_id: str) -> str:
    """Get active blockers"""
    blockers = jira_client.get_blockers(project_id)
    enriched = []
    for b in blockers:
        enriched.append({
            "task_id": b["id"],
            "title": b["title"],
            "blocked_since": b["blocked_since"],
            "blocking_tasks": b.get("dependents", []),
            "assignee": b["assignee"],
            "blocker_reason": b.get("blocker_reason", "Not specified"),
        })
    return json.dumps(enriched)

@tool
def create_task(project_id: str, title: str, description: str, assignee: str, story_points: int, labels: list[str]) -> str:
    """Create a Jira task"""
    task = jira_client.create_issue(project=project_id, summary=title, description=description, assignee=assignee, story_points=story_points, labels=labels)
    return f"Task created: {task['key']} — {task['url']}"

@tool
def send_standup_reminder(project_id: str, message: str, channel: str = "slack") -> str:
    """Send a Slack reminder"""
    slack_client.post_message(channel=channel, text=message)
    return f"Notification sent to {channel}"

@tool
def decompose_epic(epic_description: str, team_skills: list[str]) -> str:
    """Decompose an epic"""
    decomposer_llm = ChatOpenAI(model="gpt-4o")
    result = decomposer_llm.invoke(f"Decompose the epic: {epic_description}\nSkills: {team_skills}\nReturn a JSON list of tasks")
    return result.content

What Tasks Does AI-PM Automate?

The system automates three key areas:

  • Status collection and synchronization — pulls data from Jira every 15 minutes, calculates velocity and sprint progress.
  • Blocker escalation — when a blocker older than 2 days is detected, sends an alert in Slack specifying the responsible person.
  • Report generation — creates a standup digest (5–7 items), a weekly stakeholder report, and an executive summary.

Practical Case: SaaS Company, 8 Product Teams

Situation: 8 Scrum teams, 2 engineering managers, the PM spent ~30% of time on status collection and reports.

Automations:

  • Daily standup digest in Slack at 9:45 AM
  • Automatic task creation from Slack messages saying "need to do X"
  • Weekly stakeholder report on Fridays
  • Risk alert when velocity gap > 3 SP
  • Escalation of blockers older than 2 days with no comments

Results:

Metric Before After Improvement
PM time on admin tasks 30% 17% -42%
Blockers older than 3 days 100% 29% -71%
Sprint goal misses 30% 20% -33%
Team usefulness rating 4.1/5.0

Engineering Manager: "Thanks to implementing AI-PM, we reduced administrative task time by 42%. This gave the team more time for development."

How to Deploy the System: Step-by-Step Guide

  1. Integration with tools — set up Jira, Slack, Confluence, and Git via APIs. We provide ready-made configs for OAuth and tokens.
  2. LLM agent setup — choose a model (GPT-4o, Claude 3.5), set the system prompt and triggers for actions (e.g., risk threshold).
  3. Define workflows — configure chains: fetch metrics → analyze → action (alert, create task).
  4. Test run — run the agent on a test project, check trigger firing.
  5. Monitoring and refinement — track risk accuracy and adjust thresholds or prompts as needed.
Function Manual PM AI-PM Agent
Status collection 30% of time Automatic
Epic decomposition 2–3 hours/week <5 minutes
Reports 2–4 hours/week Instant
Blocker escalation Depends on PM Real-time

Process of Work

  1. Analysis — study current processes, integrations, team pain points.
  2. Design — design the agent workflow, select models, define triggers.
  3. Implementation — write agent code, integrate with Jira, Slack, Confluence, Git. Use LangGraph for state management.
  4. Testing — run on a test project, verify all scenarios.
  5. Deployment and training — deploy in Docker, train the PM on the system.

What's Included

  • Documentation: architecture description, API specs, PM guide.
  • Code: repository with agent implementation, configs, deployment scripts.
  • Integrations: setup of Jira, Slack, Confluence, GitLab/GitHub.
  • Training: session for PM and team, feature demonstration.
  • Support: first 2 weeks post-deployment — hand-holding and adjustments.

Timelines and Pricing

Estimated timelines: from 7 to 11 weeks depending on integration complexity and number of teams. Pricing is calculated individually — get a consultation to evaluate your project. We guarantee quality thanks to experience in deploying AI agents in product teams.

Why Implement an AI-PM Agent?

Our team has completed more than 20 projects in project management automation. Average project budget savings are 30-40%, and reduction in management routine costs reaches 70%. In monetary terms, this can mean savings from $40,000 to $100,000 per year depending on scale. Request a consultation to assess your team's opportunities.

LLM Development: Fine-Tuning, RAG, Agents, and Production Deployment

Using GPT‑4 or Claude 3.5 Sonnet through a public API is not a solution — it's just a tool. When the requirement is to "make it like ChatGPT, but on our data," there is a real engineering challenge behind it: from prompt engineering to training a 70B model on your own infrastructure. End-to-end LLM solution development is a complex stack, and we have been doing it for over 5 years. During this time, we have completed over 20 projects in generative AI: from RAG systems for legal departments to custom support agents. Where exactly your task falls depends on data, latency requirements, budget, and how critical confidentiality is.

A typical situation: the client has already tried ChatGPT, but results are unstable — sometimes accurate, sometimes hallucinating. Or they need integration into a corporate portal while complying with security policies. Let's break down each layer of the stack in detail — from RAG to production deployment.

Why Do RAG Systems Break and How to Fix It?

RAG (Retrieval-Augmented Generation) looks simple: find relevant documents, put them in context, get an answer. In practice, it fails in several places.

Chunking without overlap. Classic mistake: chunk_size=512, overlap=0. If the answer lies across two chunks, retrieval won't find either with sufficient confidence. Solution: overlap 15–25% of chunk_size, or better yet, sentence-aware splitting with spaCy or NLTK instead of naive character splitting.

Poor embedder. text-embedding-ada-002 is good for general use, but on legal or medical texts, specialized models like E5-large-v2, BGE-M3, or fine-tuned sentence-transformers on domain data outperform it. Recall@5 differences can be 15–25%.

No re-ranking. Vector search optimizes for speed, not relevance. A cross-encoder re-ranker (ms-marco-MiniLM-L-6-v2, bge-reranker-large) after initial retrieval improves top-3 accuracy with acceptable latency (+50–150ms). This is often more impactful than improving the embedding model.

Hybrid search. Dense vectors alone work poorly on exact queries: names, SKUs, codes. BM25 (sparse) finds exact matches but misses semantics. Hybrid via RRF (Reciprocal Rank Fusion) is the optimal compromise. Qdrant, Weaviate, and pgvector 0.7+ support hybrid search natively.

Typical production architecture for a corporate knowledge base
  1. Documents → preprocessing (PyMuPDF, Unstructured)
  2. Chunking → embedding (BGE-M3)
  3. Qdrant (hybrid dense+sparse)
  4. Cross-encoder re-ranking
  5. Context → LLM (vLLM or OpenAI API)
  6. Answer with sources (RAGAS for quality evaluation)

When to Fine-Tune Instead of Prompt Engineering?

Prompt engineering solves ~70% of LLM adaptation tasks for a domain. The remaining 30% require fine-tuning. Three indicators: the model ignores a specific output format even with detailed prompting; the task requires deep knowledge of specialized vocabulary (medicine, law); you need to significantly reduce token costs by replacing a large model with a smaller specialized one.

LoRA and QLoRA are the standard for SFT. LoRA adds trainable low-rank matrices to attention layers. A typical configuration for Llama-3 8B: r=64, lora_alpha=128, target_modules=["q_proj","v_proj","k_proj","o_proj"] yields ~0.8% trainable parameters, training on one A100 40GB. QLoRA adds 4-bit quantization (NF4) and allows fine-tuning 70B models on two A100 40GB, though speed drops by half compared to bf16.

DPO instead of RLHF. Direct Preference Optimization requires only (chosen, rejected) pairs, not scalar reward signals. DPOTrainer from the trl library (Hugging Face) implements it in a few dozen lines.

Common mistake. A dataset of 500 examples, 5 epochs, validation loss 0.8 — seems fine. But on test, the model degrades on general instructions. Cause: catastrophic forgetting. Solution: add 10–20% general instruction-following examples (Alpaca, FLAN) to the training set to preserve original capabilities.

How to Choose a Base Model: 8B or 70B?

Model Parameters Strengths Context
Llama-3.1 8B 8B Quality/speed balance 128k
Llama-3.1 70B 70B Complex reasoning 128k
Mistral 7B / Mixtral 8x7B 7B / 47B Efficiency for size 32k
Qwen2.5 72B 72B Code, multilingual 128k
Gemma 2 27B 27B Open license 8k

For most tasks, fine-tuning an 8B model is sufficient. 70B is needed when deep reasoning is required or the 8B baseline does not reach the required quality even after fine-tuning. Inference cost for Llama-3 8B via vLLM on A100 is efficient; the exact cost depends on volume.

What Does PagedAttention Bring to Production?

vLLM is the first choice for serving open-source models. PagedAttention is the key technical innovation: KV-cache is managed like virtual memory in an OS, without fragmentation. This yields 2–4x higher throughput compared to naive HuggingFace Transformers inference. The vLLM documentation confirms that continuous batching and PagedAttention are the standard for high-load LLM services.

Typical numbers on A100 80GB for Llama-3 8B (bf16): 400–600 req/s, P50 latency 200–400ms, P99 latency 600–900ms at concurrency 64. For 70B on two A100 with tensor parallelism: 80–120 req/s, P99 latency 1.5–2.5s. AWQ or GPTQ quantization reduces memory consumption by 2x with quality loss within 1–3%.

Multi-Agent Systems

Agents are LLMs with access to tools: search, code execution, API calls, database interaction. Common patterns:

  • ReAct (Reason + Act): the model reasons → chooses a tool → observes the result → reasons again. LangChain and LlamaIndex implement it out of the box.
  • Multi-agent orchestration: multiple specialized agents with a coordinator on top. Example: coordinator → researcher (search + summarization) → coder (code generation and execution) → critic (verification). Tools: AutoGen (Microsoft), CrewAI, custom implementation on LangGraph.

In production, agent systems are non-deterministic. Essential: guardrails, step limits, logging of each step, human-in-the-loop for critical actions.

How We Work: Stages, Timeline, Deliverables

Stage Duration What You Get
Audit and data collection 1–2 weeks Eval dataset of 100+ examples, task formalization
Baseline (prompt + RAG) 1–2 weeks Working prototype, quality metrics
Fine-tuning (if needed) 2–4 weeks Trained model, LoRA weights, model card
Deployment and monitoring 1–2 weeks vLLM server, Grafana + Prometheus
Documentation and training 1 week API documentation, team training

What Is Included

We deliver:

  • Technical documentation (model card, configs, deployment instructions)
  • Access to infrastructure (code repository, trained weights)
  • 1 month of post-deployment support (consultations, bug fixes)
  • Customer team training (2–3 sessions on system operation)

Timeline: basic RAG prototype — 1–2 weeks. Fine-tuning with customer data — 3–6 weeks (including data preparation). Production system with monitoring and retraining — 2–4 months. Cost is calculated individually based on data volume, model complexity, and infrastructure requirements.

We guarantee the quality of the final model with performance benchmarks and ongoing monitoring. Our engineers have hands‑on experience with dozens of production LLM systems.

Want to evaluate your project? Leave a request — we will prepare a preliminary summary within 1–2 business days. Or get a consultation on choosing the approach: RAG, fine-tuning, or hybrid — we will tell you what works best for you. Contact us to discuss your LLM development needs. Schedule a free consultation today.