Tilda site development: landing pages, corporate sites, blogs

Our company is engaged in the development, support and maintenance of sites of any complexity. From simple one-page sites to large-scale cluster systems built on micro services. Experience of developers is confirmed by certificates from vendors.

Development and maintenance of all types of websites:

Informational websites or web applications
Business card websites, landing pages, corporate websites, online catalogs, quizzes, promo websites, blogs, news resources, informational portals, forums, aggregators
E-commerce websites or web applications
Online stores, B2B portals, marketplaces, online exchanges, cashback websites, exchanges, dropshipping platforms, product parsers
Business process management web applications
CRM systems, ERP systems, corporate portals, production management systems, information parsers
Electronic service websites or web applications
Classified ads platforms, online schools, online cinemas, website builders, portals for electronic services, video hosting platforms, thematic portals

These are just some of the technical types of websites we work with, and each of them can have its own specific features and functionality, as well as be customized to meet the specific needs and goals of the client.

Showing 1 of 1All 2062 services
Tilda site development: landing pages, corporate sites, blogs
Simple
~2-3 days
Frequently Asked Questions

Our competencies:

Development stages

Latest works

  • image_website-b2b-advance_0.webp
    B2B ADVANCE company website development
    1358
  • image_web-applications_feedme_466_0.webp
    Development of a web application for FEEDME
    1250
  • image_websites_belfingroup_462_0.webp
    Website development for BELFINGROUP
    956
  • image_ecommerce_furnoro_435_0.webp
    Development of an online store for the company FURNORO
    1188
  • image_crm_enviok_479_0.webp
    Development of a web application for Enviok
    929
  • image_bitrix-bitrix-24-1c_fixper_448_0.webp
    Website development for FIXPER company
    947

A client arrives with a task: launch a landing page in a week, but standard Tilda blocks are not enough for a unique design. They need animations, custom forms, CRM integration — and the builder supposedly doesn't support that. Actually, Tilda with Zero Block allows implementing virtually any layout without sacrificing development speed. We've been professionally developing on Tilda for over 5 years: we've launched more than 50 projects — from simple landing pages to corporate portals with custom logic. Our experience shows that Tilda can solve tasks that typically require frameworks if you use Zero Block and configure integrations properly. Compared to custom development, Tilda reduces launch time by 3–5 times and cost by up to 60%.

In a typical project, we outline phases: analytics, prototyping, building on Zero Block, configuring collections and CRM, SEO optimization, testing. Timelines range from 2 business days for a landing page to 3 weeks for an editorial portal. Flexible setup for your business is a key advantage of working with us. We guarantee the site will meet modern performance standards, and you'll be able to edit content independently.

Site Architecture on Tilda

A Tilda site consists of pages, each assembled from blocks. They can be divided into three types:

  • Standard blocks (Hero, CTA, Gallery, Form, Prices, etc.) — taken from Tilda's library and configured via the visual editor.
  • Zero Block — custom HTML/CSS/JS sections that allow implementing unique layout without platform restrictions.
  • Tilda Widget — embeddable widgets (calculators, sliders, maps).

In a typical project, the page structure looks like this:

  • Home: Hero + Social Proof + Services + CTA + Footer
  • About: Hero + Team + History + CTA
  • Services: catalog page with a list
  • Service page: description + benefits + examples + form
  • Blog: list of articles (Tilda collection)
  • Article: editorial publication
  • Contacts: map + form + details

What Blocks Are Used in a Typical Project?

Standard blocks cover basic needs: Hero for the first screen, CTA for call to action, Gallery for images, Form for lead collection. When unique design or functionality is required, Zero Block is used. Tilda Widgets are used for third-party services: maps, videos, calculators.

How Zero Block Helps Bypass Tilda's Limitations?

Zero Block is a built-in HTML/CSS/JS editor. You can create any section: scroll animations, complex grids, custom forms. For example, a custom header with parallax or an interactive map. Zero Block gives full control over markup while keeping visual editing of other blocks. Compared to framework-based layout, it reduces launch time by 2–3 times.

Tilda and Dynamic Content

Tilda Collections is a tool for managing repetitive content (services, portfolio, team). Content is filled in a table, the card is drawn once. Blogging is done via Tilda Blog with categories, RSS, and SEO support.

Forms and CRM

The built-in Tilda Forms module is suitable for lead collection. Integrations with AmoCRM, Bitrix24, HubSpot, Google Sheets, Telegram. Setting up webhook: in the form editor → "Integrations" → Webhook → endpoint URL. Tilda sends POST with form fields in JSON. If custom processing is needed (validation, deduplication) — Zero Block with a form and your own API. Compared to custom form layout, integration via Tilda Forms saves up to 40% of setup time.

What You Need to Know About SEO on Tilda?

SEO setup starts with meta tags: Title, Description, og:image, canonical for each page. robots.txt and sitemap.xml are generated automatically on the Business+ plan. Technical limitation: JavaScript rendering (Googlebot renders JS), no server-side rendering. For loading speed, we move critical CSS to Zero Block, images — WebP with srcset. Adhering to these rules guarantees correct indexing: average LCP — 1.8 sec, CLS — 0.05. Order an audit of your current Tilda project — free evaluation of potential.

Domain Setup and Hosting

Tilda hosts the site on its infrastructure. To connect a custom domain:

  1. In your DNS provider, create a CNAME: www → sites.tilda.ws and an A record: @ → 178.248.236.5.
  2. In Tilda project settings → "Domain" → specify the domain → link.

SSL is issued automatically. Naked domain is configured via redirect.

Export and Portability

HTML export is available on Business+. The exported code works as a static site, but without forms and CRM — you'll need your own backend. This is an option for migration, not daily work.

Tariffs and Limitations

Plan Pages Projects HTML Export Collections
Free 1 1
Personal 50 1 +
Business 500 5 + +
Business+ Unlimited Unlimited + +

Media storage: 1 GB on Personal, 3 GB on Business. For large volumes, we use external storage (Cloudinary).

Comparison of Tilda and custom development:

Criteria Tilda Custom Development
Launch time 2 days – 3 weeks 2–6 months
Design flexibility High (Zero Block) Absolute
Integration complexity Limited (built-in modules) Unlimited
Cost Low High

What’s Included in the Work

Within a Tilda site development project, we provide:

  • Prototype of structure and layouts (if needed)
  • Assembly on Zero Block with custom styling
  • Configuration of collections and dynamic content
  • Integration with CRM, forms, newsletters
  • SEO setup (meta tags, robots.txt, sitemap)
  • Training on site editing
  • Administration documentation
  • Support for 30 days after launch

Common mistakes in Tilda development: ignoring load speed due to unoptimized images, using only standard blocks for complex pages, missing redirects when changing URLs, insufficient testing of forms and integrations, neglecting SEO settings for blog articles. We help avoid these issues.

Contact us to discuss your project. Get a consultation on architecture and Zero Block capabilities — we'll help choose the optimal solution.

Choosing a Site Type is a Technical Task, Not Marketing

We see teams waste budget on the wrong stack. A landing page on Next.js with static generation and a corporate site with CMS are fundamentally different infrastructures, even if they look similar. A mistake at the start leads to 5–10x higher hosting costs and slow loading speeds. Core Web Vitals (LCP, INP, TTFB) have different priorities for each site type. Below we break down four types of websites, their typical technical mistakes, and how we fix them.

How to Avoid Mistakes When Choosing a CMS?

Business Card Website

The most compact format: 1–5 pages, minimal dynamics. The main goal is to provide contact information and make a first impression. Technically not complex, but there are traps.

Stack too heavy. WordPress with 15 plugins for 5 pages gives 800ms TTFB on shared hosting. We propose static: HTML/CSS/JS or Next.js with output: 'export', deployed on Vercel or Cloudflare Pages. No PHP, no database — only CDN. TTFB < 50ms guaranteed. Hosting savings up to 50,000 ₽ per year.

No contact form with backend validation. A form with only JS validation is decoration. The backend must validate, rate-limit, and send notifications. For static sites we use Formspree or a serverless endpoint.

Missing Schema.org markup. Google Knowledge Panel relies on LocalBusiness or Organization markup — address, phone, hours. For a business card site this is critical. We embed it in the template.

Development time: 2–3 weeks with design. Order a turnkey development — we will evaluate your project in one day.

Why Does Landing Page Speed Directly Affect Conversion?

Landing Page

A landing page has one goal: conversion. Everything not leading to the target action is unnecessary. Core Web Vitals are critical here because of paid traffic, and Google uses CWV as a factor in Quality Score.

A specific case: a landing page with an 8MB hero video autoplay in MP4 without preload="none" + three third-party analytics scripts synchronously in <head>. LCP 9.4s, INP 780ms. We replaced the video with a poster image loaded lazily on scroll, moved scripts to async/defer and partially to Web Workers via Partytown. LCP 1.8s, INP 140ms. Conversion increased by 23% — solely due to speed, not design.

A/B testing is standard practice. Google Optimize shut down, but there are Growthbook (open source), PostHog, VWO. For Next.js we use edge middleware to distribute traffic at the CDN level without extra JS.

Timeline: 2–4 weeks. Contact us for a consultation — we will estimate timeline and budget in one day.

Corporate Website

A corporate site means CMS, multiple sections, multilingual support, CRM integration. The key question: who will edit the content and how often.

If editors are non-technical, a visual editor is needed. WordPress with Gutenberg or ACF Pro covers this. For complex structures — headless CMS (Strapi, Directus) with a frontend on Next.js. If the site updates infrequently — Markdown in Git with Astro or Next.js. Deploy on push to main — no CMS.

Performance. An "About Us" page with 40 original photos — LCP 12 seconds on mobile. Next.js <Image> component with WebP and srcset solves it without manual work.

Multilingual: Astrotomic Translatable on Laravel or next-intl / react-i18next. URL structure — /ru/about, /en/about with hreflang.

Timeline: 6–12 weeks depending on scope.

Promo Site

A promo site is temporary or permanent for a campaign. Non-standard design, animations, interactivity. Stack: GSAP, Framer Motion, Three.js, Lottie, Canvas API.

The main pitfall — animations that lag on mobile. GPU animations via transform and opacity are fine. box-shadow in animation, filter: blur() on every frame, animating width/height — causes 20fps on iPhone 12. will-change: transform helps pointwise.

Prefers-reduced-motion is mandatory for accessibility. We always add it.

Timeline: 3–6 weeks depending on complexity.

Comparison Table

Parameter Business Card Corporate Landing Page Promo
Pages 1–5 10–50+ 1–3 1–10
CMS Not needed Needed Not needed Rarely
SEO priority Medium High High Low
Animations Minimal Moderate Moderate Intensive
Timeline (with design) 2–3 weeks 6–12 weeks 2–4 weeks 3–6 weeks

Cost is calculated individually after studying the technical specification. Google recommends TTFB under 0.8s, ours is <0.2s.

What Does Our Work Include?

  • Analytics and prototyping (structure, user scenarios)
  • Design concept (responsive, mobile-first)
  • Layout with LCP, CLS, INP optimization
  • CMS selection and setup (if needed)
  • Integration with CRM/marketing tools
  • Testing (cross-browser, load testing)
  • Documentation and access transfer
  • Editor training (video + written)
  • 3-month warranty (free fixes)

Our Expertise

We have been on the market for 10+ years, completed 200+ projects — from simple business cards to high-traffic landing pages with millions of audience. Every project undergoes Core Web Vitals audit before release.

Second Table: Approach Comparison

Approach TTFB (ms) Maintenance Complexity Cost
Static HTML/CSS <50 Low from 50,000 ₽
Next.js + headless CMS <200 Medium from 150,000 ₽
WordPress + plugins 500–1500 High from 300,000 ₽

Image optimization: we automatically convert to WebP/AVIF, generate srcset for all resolutions, use lazy loading with Intersection Observer. For background images — progressive loading technique. This alone cuts page weight by 60–80%.

Contact us for a consultation on your project. Order turnkey development — we will estimate timeline and budget in one day.